Charleston Dashboard Preview

Quote Expiration Risk Index

Public preview for Charleston contractors deciding when to shorten quote windows, watch material-heavy bids, and reconfirm pricing.

Charleston Metro · Public Preview · Monday, May 18-Sunday, May 24, 2026

Source: BLS Producer Price Index data via FRED · Directional planning signal · Not Charleston supplier pricing · Last updated: May 18, 2026

Construction Materials Index

Elevated

Material quote expiration risk appears elevated for bids held open without written windows.

30-Day / Monthly Change

+0.6%

Monthly movement points to active pricing pressure across construction inputs.

3-Month Movement

+1.8%

Recent movement supports shorter quote windows on material-heavy bids.

Year-over-Year Movement

+3.9%

Annual movement remains high enough to avoid stale pricing assumptions.

Material Risk Preview

Public Preview

Electrical wire, conduit, and gear

Appears elevated. Reconfirm pricing before acceptance if the proposal has been open more than a week.

Watch

10-14 days

HVAC equipment and controls

Watch equipment availability and manufacturer price updates before holding package pricing.

Watch

10-14 days

Lumber, framing, and sheathing

Use normal caution, but keep a written expiration window for larger takeoffs.

Low

14 days

Roofing shingles and metal accessories

Reconfirm pricing where color, profile, or accessory availability controls the estimate.

Low

14-21 days

Get the Full Quote Expiration Dashboard

Subscribe for the full material-by-category grid, quote window recommendations, contractor checklist, and StackQuotes proposal education.

Source: BLS Producer Price Index data via FRED · Directional planning signal · Not Charleston supplier pricing · Last updated: May 18, 2026